Exercise 11 - Cross SubSchedule Events

  1. Record the fully qualified Schedule name of the SUBSCHEUDLE using the Schedule Instance TIME of 15 created in Exercise 10.
  2. If the Schedule is still running, cancel all Jobs to close out the Schedules and delete the PRIMARY SCHEDULE from the Daily list.
  3. Add the following Schedule Instance Property to PRIMARY SCHEDULE: TIME=15
  4. Add a Null Job to the Primary Schedule.
    • Frequency: Mon-Fri-N
    • Event: Skip the 2nd Job within the SUBSCHEDULE with the Job Instance Property of TIME=15.
      • Use the fully qualified Schedule Name.
      • Use the new Schedule Instance Property [[SI.TIME]] in place of the number 15 in the name.
  5. Rebuild the Schedule and verify that the appropriate Job was skipped.

Enterprise Manager

Details
  1. Record the fully qualified Schedule name of the SUBSCHEUDLE using the Schedule Instance TIME of 15 created in Exercise 10.
  2. If the Schedule is still running, cancel all Jobs to close out the Schedules and delete the PRIMARY SCHEDULE from the Daily list.
  3. Add the following Schedule Instance Property to PRIMARY SCHEDULE: TIME=15
  4. Add a Null Job to the Primary Schedule.
    • Frequency: Mon-Fri-N
    • Event: Skip the 2nd Job within the SUBSCHEDULE with the Job Instance Property of TIME=15.
      • Use the fully qualified Schedule Name.
      • Use the new Schedule Instance Property [[SI.TIME]] in place of the number 15 in the name.
  5. Rebuild the Schedule and verify that the appropriate Job was skipped.